How to contact wind power company for setting of wind power plant in my land ?
I am an engineering grduate.I have land of 20 acres in my village.its 130 km from Mumbai.
i have 2-3 ideas in my mind. first i can set up wind power stations with collabration pvt compnys.
but for that i dont have any contact with the company.
Any body can guide me for setting of this goal
Any kind of suggestion are always welcome
1 Comment
RSS feed for comments on this post.
Sorry, the comment form is closed at this time.
Run a 90 day wind velocity analysis and send the results to any wind harvesters you can locate. Don’t indulge in any hot air pontification.
References :
Comment by Yorky — @